EQUIPMENT & JOBSITE FUELING

FUEL THE EQUIPMENTWHERE THE WORK IS HAPPENING.

Jobsites create a different fueling challenge than fleet yards. Equipment may be spread across an active site, require different diesel products, move as the project progresses, and operate on schedules that change with the work. FLEET PERFORMANCE SERVICES builds the fueling approach around the site.

BUILD MY JOBSITE FUELING PLAN →
FIELD PLANJOBSITE SERVICE PATH
  1. 01SITE ACCESS
  2. 02STAGING AREA
  3. 03EQUIPMENT ZONE
  4. 04FUELING POINT
ACCESSVERIFYSERVICE

FUEL REQUIREMENTS

KNOW WHAT GOES WHERE.

PRODUCT 01

DYED DIESEL

For qualifying off-road equipment and other eligible non-highway uses.

PRODUCT 02

CLEAR DIESEL

For applicable licensed/on-road diesel vehicles and equipment requiring clear fuel.

PRODUCT 03

DEF

For applicable diesel vehicles and equipment equipped with SCR emissions systems.

The customer's equipment and application determine the appropriate fuel product. FLEET PERFORMANCE SERVICES confirms product requirements as part of the service-planning process.

FLEET PERFORMANCE SERVICES DOES NOT CURRENTLY PROVIDE GASOLINE DELIVERY.

SERVICE FIT

THE SITE TELLS USHOW TO BUILD THE PLAN.

FLEET PERFORMANCE SERVICES reads the equipment mix, access, staging, schedule, product requirements, and project movement before finalizing a jobsite fueling approach.

  1. 01EQUIPMENT MIX

    What needs fuel?

  2. 02SITE LAYOUT

    Where is it located?

  3. 03EQUIPMENT STAGING

    How concentrated or distributed are the assets?

  4. 04OPERATING SCHEDULE

    When is equipment available?

  5. 05PRODUCT REQUIREMENTS

    What does each asset require?

  6. 06PROJECT MOVEMENT

    Will the fueling point change?

ACTIVE JOBSITE COORDINATION

THE PLAN HAS TO MOVEWITH THE WORK.

Active work areas, changing staging points, designated access routes, site-entry requirements, and the customer's site contact shape how the service window is coordinated.

  1. 01SITE ENTRY
  2. 02COORDINATE WITH SITE CONTACT
  3. 03VERIFY EQUIPMENT & PRODUCTS
  4. 04FUEL APPROVED ASSETS
  5. 05DOCUMENT DELIVERY
  6. 06EXIT / NEXT SERVICE WINDOW

PRE-MOBILIZATION BRIEF

BEFORE THE FIRST SERVICE WINDOW,FLEET PERFORMANCE SERVICES NEEDS TO UNDERSTAND THE SITE.

FLEET PERFORMANCE SERVICES / FIELD INPUTSPRE-SERVICE REVIEW
  • 01LOCATION
  • 02ACCESS
  • 03EQUIPMENT
  • 04PRODUCTS
  • 05CONSUMPTION
  • 06WORK HOURS
  • 07STAGING
  • 08PROJECT MOVEMENT

These operating details help FLEET PERFORMANCE SERVICES evaluate service fit and determine how a jobsite fueling approach could be structured around the work.

THE SERVICE VISIT

ONE SITE.MULTIPLE ASSETS.THE RIGHT PRODUCT FOR EACH.

  1. 01

    ARRIVE & COORDINATE

    FLEET PERFORMANCE SERVICES arrives at the approved location and coordinates access based on the agreed service plan.

  2. 02

    VERIFY ASSETS & PRODUCTS

    Eligible equipment and applicable fuel-product requirements are identified before fueling.

  3. 03

    FUEL ELIGIBLE EQUIPMENT

    FLEET PERFORMANCE SERVICES services the equipment included in the approved fueling plan according to the operating requirements.

  4. 04

    DOCUMENT THE DELIVERY

    Fueling activity is recorded to support delivery verification and customer records.

KEEP THE EQUIPMENT ON THE JOB.LET FLEET PERFORMANCE SERVICES BRING THE FUEL TO IT.

Tell FLEET PERFORMANCE SERVICES what you're operating, where the work is happening, and when the equipment is available. We'll use those details to evaluate an appropriate jobsite fueling approach.

BUILD MY JOBSITE FUELING PLAN →